Agenda of 4th KEKB Accelerator Review Committee
March 08-10, 1999
at KEK
  Mar. 08 (Mon.) - Mar. 10 (Wed.) | |||
  |   Executive session |   |   |
  |   Overview of KEKB Accelerator System |   S. Kurokawa |   pdf |
  |   The members of the KEKB Commissioning Team |   K. Oide |   pdf |
  |   Commissioning Summary of the Injector Linac |   A. Enomoto |   pdf |
  |   Stability Upgrade of Injector Linac |   H. Kobayashi |   pdf |
  |   PEP-II Status & Plans |   J. Seeman |   pdf |
  |   Lattice Analysis |   H. Koiso |   pdf |
  |   Orbit Analysis |   Y. Ohnishi |   pdf |
  |   Orbit drift in KEKB ring |   K. Akasaka |   pdf |
  |   Instabilities |   H. Fukuma |   pdf |
  |   First Observation of Beam Collision in KEKB |   Y. Funakoshi |   pdf |
  |   Beast |   L. Moffitt |   pdf |
  |   Spent particles beam background simulation |   A. Bozek |   pdf |
  |   KEKB ring magnets |   M. Masuzawa |   pdf |
  |   Magnet Power Supply |   M. Yoshida |   pdf |
  |   Installation and Alignment of Magnets in the KEKB |   R. Sugahara |   pdf |
  |   Commissioning of KEKB Vacuum System |   Y. Suetsugu |   pdf |
  |   Vacuum System around IR |   K. Kanazawa |   pdf |
  |   RF System |   K. Akai |   pdf |
  |   The ARES Cavity |   T. Kageyama |   pdf |
  |   Superconducting cavity |   T. Tajima |   pdf |
  |   Present Status of the crab cavity development |   Y. Morita |   pdf |
  |   Overview of Beam instrumentations |   S. Hiramatsu |   pdf |
  |   Beam position monitor system for KEKB |   M. Tejima |   pdf |
  |   Status of SR Monitor |   T. Mitsuhashi |   pdf |
  |   Bunch Feedback system |   E. Kikutani |   pdf |
  |   IRQ |   M. Tawada |   pdf |
  |   Interaction Region |   K. Tsuchiya |   pdf |
  |   KEKB Control system status |   N. Yamamoto |   pdf |