Agenda of the Twelfth KEKB Accelerator Review Committee
March 19-21, 2007
at Meeting room on the first floor of Build. No.3, KEK Tsukuba, Japan
|   Mar. 19 (Mon.) | |||
|   8:30- 9:00 |   Executive Session | ||
|   9:00- 9:10 |   Welcome |   F. Takasaki |   pdf,  ppt |
|   9:10- 9:25 |   Overview |   K. Oide |   pdf,  key |
|   9:25- 9:55 |   Beam Comissioning before Crab Cavity |   Y. Funakoshi |   pdf,  ppt |
|   9:55-10:15 |   Belle Status |   Y. Ushiroda |   pdf,  ppt |
|   10:15-10:35 |   Coffee |   |   |
|   10:35-10:55 |   BPM Displacement Monitor |   H. Fukuma |   pdf,  ppt |
|   |   ================ Crab Cavity ================ | ||
|   10:55-11:30 |   Crab Cavity Overview |   K. Hosoyama |   pdf,  ppt |
|   11:30-12:00 |   RF Design of Crab Cavity |   Y. Morita |   pdf,  ppt |
|   12:00-13:00 |   Lunch |   |   |
|   13:00-13:20 |   Cryogenics, etc. |   K. Nakai |   pdf,  ppt |
|   13:20-13:45 |   Horizontal Tests for Crab Cavities |   Y. Yamamoto |   pdf |
|   13:45-14:05 |   Installation of Crab Cavity |   M. Ono |   pdf,  ppt |
|   14:05-14:35 |   Commissioning of Crab RF System |   K. Akai |   pdf,  ppt |
|   14:35-15:10 |   Beam Commissioning with Crab Cavity |   H. Koiso |   pdf,  ppt |
|   15:10-15:30 |   Coffee |   |   |
|   15:30-15:50 |   Beam-Beam Effect with Crab Cavity |   K. Ohmi |   pdf,  ppt |
|   15:50-16:10 |   Observation of Crab Crossing with Streak Camera |   H. Ikeda |   pdf,  ppt |
|   |   ============== Upgrade Studies ============== | ||
|   16:10-16:35 |   Recent Upgrade Studies of Vacuum Components |   Y. Suetsugu |   pdf,  ppt |
|   16:35-16:50 |   Secondary Electron Yield |   S. Kato |   pdf,  ppt |
|   16:50-17:05 |   Electron Cloud Measurement and Vacuum Chamber Design |   K. Kanazawa |   pdf,  ppt |
|   17:05-17:20 |   Development of Pulsed Quadrupoles |   T. Mimashi |   pdf,  ppt |
|   17:30- |   Reception |   |   |
|   Mar. 20 (Tue.) | |||
|   8:30- 9:00 |   Executive Session | ||
|   9:00- 9:20 |   QCS for SuperKEKB |   N. Ohuchi |   pdf,  ppt |
|   9:20- 9:40 |   Crab Waist Optics |   A. Morita |   pdf |
|   9:40-10:00 |   Lattice Design for Super B |   Y. Ohnishi |   pdf,  ppt |
|   10:00-10:20 |   Beam-Beam Effects in Super B |   K. Ohmi |   pdf,  ppt |
|   10:20-10:40 |   Coffee |   |   |
|   10:40-11:10 |   First application of a tungsten single-crystal positron source at the KEKB injector linac |   T. Suwada |   pdf,  ppt |
|   11:10-11:40 |   Injector Upgrade |   M. Satoh |   pdf,  ppt |
|   11:40-12:50 |   Lunch |   |   |
|   12:50-13:20 |   Fuji Test Beam Line |   J. Haba |   pdf,  ppt |
|   13:20-14:00 |   PEP-II Accelerator Status |   J. Seeman |   pdf,  ppt |
|   14:00-15:00 |   Seminar: Design of Super B  (3G Seminar Hall) |   P. Raimondi |   pdf,  ppt |
|   |   ================ Crab Tour ================ | ||
|   15:00-15:30 |   Control Room with beam |   H. Koiso |   |
|   15:30-16:30 |   Nikko Tunnel without beam |   K. Hosoyama |   |
|   16:30- |   Executive Session |   |   |
|   |   | ||
|   Mar. 21 (Wed., Natl. Holiday) | |||
|   8:30- 11:00 |   Executive Session | ||
|   11:00- 12:00 |   Close-out with KEKB Staffs | ||
|   12:00 |   Adjourn | ||
|   |   | ||