Agenda of the 15th KEKB Accelerator Review Committee

KEKB Review Report (pdfdoc) (Final ver.180310_20100318)

February 15-17, 2010
at meeting room on the first floor of Build. No.3, KEK Tsukuba, Japan

  Date / Time   Subject   Presenter   Slides      
  Feb. 15 (Mon)  
  8:30 - 9:00     Executive Session       pdf 
  9:00 - 9:20     KEK Roadmap   (20')     A. Suzuki     pdf  ppt
  9:20 - 9:50     KEKB Status   (30')     Y. Funakoshi     pdf  ppt
  9:50 - 10:20     Belle & Belle-II   (30')     T. Higuchi     pdf  ppt
  10:20 - 10:40     Simultaneous Injection   (20')     K. Furukawa     pdf  ppt
  10:40 - 11:00     Coffee Break      
  11:00 - 11:20     Operation Experience of Crab Cavity   (20')     Y. Yamamoto     pdf  ppt
  11:20 - 11:40     Nano-Beam Scheme for SuperKEKB   (20')     H. Koiso     pdf  ppt
  11:40 - 12:20     Machine Parameters   (40')     Y. Ohnishi     pdf  ppt
  12:20 - 13:30     Lunch      
  13:30 - 13:50     Beam-beam Simulation   (20')     K. Ohmi     pdf 
  13:50 - 14:05     Fringe Field of Solenoid   (15')     K. Oide     pdf  
  14:05 - 14:50     Lattice Design   (45')     A. Morita     pdf  
  14:50 - 15:10     Systematic Study of Nonlinear Dynamics   (20')     E. Levichev     pdf  ppt
  15:10 - 15:30     Coffee Break      
  15:30 - 15:50     IR Overview   (20')     M. Tawada     pdf  ppt
  15:50 - 16:10     IR Magnets   (20')     N. Ohuchi     pdf  ppt
  16:10 - 16:30     IR Vacuum Chamber and Assembly   (20')     K. Kanazawa     pdf  ppt
  16:30 - 16:50     Machine-Detector Interface   (20')     M. Iwasaki     pdf 
  16:50 - 17:10     Vibration Measurement   (20')     M. Masuzawa     pdf  ppt
           
  17:30 -     Reception      
           
  Feb. 16 (Tue)  
  8:30 - 9:00     Executive Session      
  9:00 - 9:20     Injector Upgrade Overview & Positron Source   (20')     T. Kamitani     pdf  ppt
  9:20 - 9:40     RF Gun   (20')     T. Sugimura     pdf  ppt
  9:40 - 10:00     Damping Ring     (20')   M. Kikuchi     pdf 
  10:00 - 10:15     Beam Transport, Injection, Extraction from DR   (15')     N. Iida     pdf  ppt
  10:15 - 10:35     Coffee Break      
  10:35 - 10:55     RF Overview   (20')    K. Akai     pdf 
  10:55 - 11:10     ARES Cavity   (15')    T. Kageyama     pdf 
  11:10 - 11:25     Superconducting Cavity   (15')    Y. Morita     pdf 
  11:25 - 11:40     RF Accelerating Structure for DR   (15')     T. Abe     pdf  ppt
  11:40 - 12:20     Vacuum   (40')     Y. Suetsugu     pdf  ppt
  12:20 - 13:30     Lunch      
  13:30 - 14:10     Magnets   (40')     M. Masuzawa     pdf  ppt
  14:10 - 14:50     Beam Diagnostics   (40')     H. Fukuma     pdf  ppt
  14:50 - 15:05     Impedance Estimation   (15')     K. Shibata     pdf  ppt
  15:05 - 15:25     Coffee Break      
  15:25 - 15:40     Beam Abort System   (15')     T. Mimashi     pdf 
  15:40 - 16:00     Control   (20')     T. Nakamura     pdf  ppt
  16:00 - 16:20     Facility and Infrastructure   (20')     M. Ono     pdf  ppt
  16:20 - 16:35     Schedule / Budget / Human Resources   (15')     K. Akai     pdf  ppt
  16:35 -     Executive Session / Report Writing      
           
  Feb. 17 (Wed)  
  8:30 - 11:00     Executive Session      
  11:00 - 12:00     Close-out      
  12:00     Adjourn      
           
  Feb. 18 (Thu)  
  15:00     Celebration for 1,000 fb-1        
           
  Feb. 19 (Thu) - 20 (Fri)  
  9:00 -     Belle Review10     Belle    
           



KEKB Accelerator Review Members


Last update: 2010/04/01 10:00