Agenda of the 21st KEKB Accelerator Review Committee

KEKB Review Report (pdf) (Final 20160711)

June 13-15, 2016
at meeting room on the first floor of Build. No.3, KEK Tsukuba, Japan

  Date / Time   Subject   Presenter   Slides      
  Jun. 13 (Mon)  
  8:30 - 9:00     Executive Session      
  9:00 - 9:05     Welcome   (5')     Seiya Yamaguchi    
  9:05 - 9:45     Overview of SuperKEKB, status and plans   (40')     Kazunori Akai     pdf  
  9:45 - 10:15     Belle II physics and construction status   (30')     Tom Browder     pdf  pptx
  10:15 - 10:35     Coffee Break      
  10:35 - 11:05     Overview of Phase 1 comissioning   (30')     Yoshihiro Funakoshi     pdf   pptx
  11:05 - 11:20     Overview of lattice   (15')     Yukiyoshi Ohnishi     pdf   key
  11:20 - 11:45     Optics correction and low emittance tuning   (25')     Hiroshi Sugimito     pdf
  11:45 - 12:25     Present status of the SuperKEKB Vacuum System   (40')     Yusuke Suetsugu     pdf   pptx
  12:25 - 13:25     Lunch   ( 1 goukan Launge )      
  13:25 - 13:45     Instabilities: simulation and observation   (20')     Kazuhito Ohmi     pdf   pptx   pdf
  13:45 - 14:10     Beam instrumentation and bunch feedback systems   (25')     Makoto Tobiyama     pdf   pptx
  14:10 - 14:25     Photon monitors     (15')   John Flanagan     pdf
  14:25 - 14:45     Operation Status of RF System     (20')   Tetsuya Kobayashi     pdf
  14:45 - 15:00     Integrated vacuum control system for RF and Operation status of SCC     (15')   Michiru Nishiwaki     pdf
  15:00 - 15:20     Normal-Conducting RF Cavities for SuperKEKB / MR & DR   (20')     Tetsuro Abe     pdf   pptx
  15:20 - 15:40     Coffee Break      
  15:40 - 16:10     Beam background     (30')   Hiroyuki Nakayamai     pdf
  16:10 - 16:50     Magnet   (40')     Mika Masuzawa , Toshiyuki Oki   pdf   pptx   pdf   pptx
  16:50 - 17:05     Beam transport and injection   (15')     Naoko Iida     pdf   pptx
  17:05 - 17:20     beam abort system   (15')     Toshihiro Mimashi     pdf   pptx
  17:20 - 17:35     Control   (15')     Tatsuro Nakamura     pdf   ppt
           
  18:00 - 20:00     Reception   ( Kenkyu honkan building )      
           
  Jun. 14 (Tue)  
  8:30 - 8:45     Executive Session      
  8:45 - 9:00     Beam injection control   (15')     Hiroshi Kaji     pdf
  9:00 - 9:15     RFgun Report   (15')     Yousuke Honda     pdf
  9:15 - 9:25     Overview of Injector   (10')     Kazuro Furukawa   pdf   pptx
  9:25 - 9:45     RFgun and Electron Beam   (20')     Mitsuhiro Yoshida   pdf   pptx
  9:45 - 10:05     Laser and RFgun   (20')     Xiangyu Zhou   pdf   pptx
  10:05 - 10:25     Coffee Break      
  10:25 - 10:45     Positron source   (20')     Takuya Kamitani     pdf   pptx
  10:45 - 11:05     Injector Alignment   (20')     Toshiyasu Higo     pdf   pptx
  11:05 - 11:25     Injector Commissioning(Phase1 & 2)   (20')     Masanori Satoh     pdf   pptx
  11:25 - 11:55     Positron damping ring   (30')    Mitsuo Kikuchi     pdf
  11:55 - 13:00     Lunch   ( Kenkyu-honkan )    
  13:00 - 13:20     Interaction Region Construction towards Phase 2   (20')    Ken-ichi Kanazawa     pdf
  13:20 - 13:40     Overview of IR magnets and construction status   (20')    Norihito Ohuchi     pdf
  13:40 - 13:55     Measurements of field quality for quadrupole magnets using harmonic coils   (15')    Yasushi Arimoto     pdf
  13:55 - 14:10     Measurement of the magnet center with streched wire system   (15')    Hiromi Iinuma     pdf   pptx
  14:10 - 14:25     Cryostat performance   (15')    Zhanguo Zong     pdf   pptx
  14:25 - 14:40     Quench protection system for superconducting solenoids   (30')    Xdon Wang    pdf
  15:00 - 17:30     Tour (KEKB control room, MR tunnel, Linac, Damping ring, QCS)   (2h30')     
  17:30 - 18:30     Dinner (3-goukan)      
  18:30 - 19:00     Executive Session / Report Writing      
           
  Jun. 15 (Wed)  
  8:30 - 11:00     Executive Session      
  11:00 - 12:00     Close-out      
  12:00 - 13:00     Lunch (3-goukan)      
           


KEKB Accelerator Review Members


Last update: 2016.07.11 11:00